Tailings Test Facility

SRC’s Pipe Flow facility includes 500 m2 dedicated to tailings research. This facility houses a 30 m³ supply tank, deposition columns and a 15 m long x 0.75 m wide x 1.6 m high open channel flume, equipped with instrumentation to detect pore pressure and density variations in test materials.

Additional equipment includes a pilot-scale thickener, mini-thickeners and a smaller 8 m long x 0.25 m wide x 0.5 m high adjustable angle flume apparatus. 

SRC’s tailings work includes:

  • Pipeline transport in both turbulent and laminar flow
  • In-line flocculation methods
  • Thickener, hydrocyclone piloting
  • Dewatering
  • Consolidation and deposition
  • Open channel flow
  • Beaching
  • Fines capture
  • Instrumentation piloting, testing and verification

Contact us to learn more about this facility.